Mastodon Twitter Instagram Youtube
Nov 29, 16

#NoDAPL Lockdown in Boone, Iowa

From Mississippi Stand

Two water protectors have entered a construction site and locked themselves to an active excavator in an effort to stop Dakota Access from boring under the Des Moines River. Immediately after the two stopped the excavator, the entire construction site shut down.

This is the last chance for Mississippi Stand to stop Dakota Access from completing their destructive mission. MS is calling on people to head up to Iowa and keep the fight alive!

As of 2pm Eastern Time, the lockdown remains in effect.

Share This:

More Like This